The Caraíba Operations are located in northeastern Bahia State, Brazil, approximately 385 kilometers north-northwest of the capital city of Salvador. The operations comprise a fully integrated copper mining and processing complex that includes the Pilar and Vermelhos underground mines and the Surubim open pit mine. Ore is processed using conventional crushing and flotation at the Caraíba Mill, located adjacent to the Pilar underground mine. The mill has a throughput capacity of approximately 4.2 million tonnes per annum and produces a high-grade copper concentrate shipped to smelters worldwide.

At the Pilar Mine, we are constructing a new, larger shaft that will transform Pilar into a two-mine system, with the existing shaft servicing the upper levels and the new shaft servicing the high-grade Deepening Extension Zone. Once operational, the shaft will enable higher total mining rates, significantly reduce transport times for people and material between the deepest areas and surface, and unlock further operational efficiencies.

The Caraíba Operations are situated in the Curaçá Valley and extend over 100 kilometers in strike length, covering more than 185,000 hectares. Near-mine and regional exploration activities have added nearly 20 years of mine life since Ero’s acquisition in 2016 and continue to offer significant upside. In September 2022, we also announced the discovery of a regional nickel sulphide system within the Curaçá Valley over an initial strike length of five kilometers.

Ownership

99.6%

Primary Commodity

Copper

Mine Types

Underground and Open Pit

2025 Production:

36,035 tonnes of copper in concentrate

2025 C1 Cash Costs:

$2.22 per pound of copper produced

2026 Production Guidance:

35,000 - 40,000 tonnes of copper in concentrate

2026 C1 Cash Costs Guidance:

$2.30 - $2.50 per pound of copper produced

Reserves & Resources

Classification Tonnage
(kt)
Grade
(Cu%)
Contained Cu
(kt)
Mineral Reserves (Underground)
Proven 14,164 1.15 163
Probable 16,710 1.57 263
Proven & Probable 30,874 1.38 426
Mineral Resources (Underground)
Measured 53,976 1.08 581
Indicated 47,558 1.17 558
Measured & Indicated 101,534 1.12 1,138
Inferred 71,690 0.82 584
Mineral Reserves (Open Pit)
Proven 18,101 0.54 99
Probable 24,083 0.54 130
Proven & Probable 42,184 0.54 228
Mineral Resources (Open Pit)
Measured 24,086 0.56 134
Indicated 35,464 0.54 193
Measured & Indicated 59,550 0.55 327
Inferred 29,746 0.49 145
Total Mineral Reserves
Proven 32,265 0.81 262
Probable 40,793 0.96 392
Proven & Probable 73,058 0.90 654
Total Mineral Resources
Measured 78,062 0.92 715
Indicated 83,021 0.90 751
Measured & Indicated 161,083 0.91 1,465
Inferred 101,436 0.72 729

Click here to access this table in Excel format, as well as additional information regarding the reserves and resources

Technical Report